happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance

Most viewed - Renovations and Maintenance
IMG_2446.jpg
Formwork27 viewsdozer
IMG_2451.jpg
Fabricating Security Metal27 viewsThe security metal will be bolted on top of the finished wall. dozer
IMG_1303.jpg
Rebar27 viewsShows how the rebar was affixed laterally and vertically for the modification. dozer
IMG_3269.jpg
Rendered Prior to Paint26 viewsdozer
IMG_2447.jpg
Ribs being Attached to Frame26 viewsThe lateral support members are wired in place each 20 centimeters. dozer
IMG_2517.jpg
Smoothing the Underside of the Beam26 viewsdozer
IMG_2594.jpg
Security Metal affixed to Top of Wall26 viewsThis security metal was fabricated here and then attached via anchor bolts. dozer
IMG_2597.jpg
Welding Security Metal26 viewsMost of the welding was done prior to putting each section in place (each section being more than 2 meters). Here two adjacent sections are being welded together. dozer
DSC05124.jpg
Original Wall26 viewsThe original side wall being raised. dozer
IMG_1315.jpg
Column Extension26 viewsThe column extensions were poured around the cinder blocks. dozer
IMG_1317.jpg
Form Work for Upper Beam26 viewsThe form work for the upper beam is being put in place.dozer
IMG_2083.jpg
Stick26 viewsLong stick bug.dozer
192 files on 16 page(s) 12

Debug Info 
Debug Output: show / hide