|

Most viewed - Renovations and Maintenance |

Welding Stainless29 viewsWelding in a cross support on-site. dozer
|
|

Stainless Guys29 viewsStainless guys inspect their work.dozer
|
|

Finished Wall29 viewsThe finished wall a while later, crack has not re-appeared. dozer
|
|

Electric to Extrude through Columns29 viewsThe level of the original electric will be raised since the columns is being extended upwards.dozer
|
|

Wall Paper29 viewsThe wall paper starting to peel in an area where there was some water damage.dozer
|
|

Grouted Tile Section29 viewsA completed and grouted section of tiles.dozer
|
|
|

New Cinder Blocks28 viewsThe new cinder blocks are laid in place. Lateral rebar supports are drilled into the existing column to help hold the cinderblocks in place. dozer
|
|

Finished View28 viewsClose up of the top beam edging. This group did good detailed work.dozer
|
|

Old Gate27 viewsThis gate was really heavy, maybe 200kg or more. It opened OK without too much effort due to stainless wheels, but was due for an upgrade.dozer
|
|

Latch Post27 viewsInstalling and polishing the stainless latch post.dozer
|
|

Polishing a Weld27 viewsdozer
|
|
192 files on 16 page(s) |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
|

|
|
|