19 viewsThe entry switch box with 6 groups of wires. On the left is the electrical for a fan. (23-May-04)dozer
19 viewsThe electrical systems feeds the 35 down lights and 5 fans hooked on the ceiling. (18-Jun-04)dozer
19 viewsPreparing the circuit breaker. (19-Jun-04)dozer
18 viewsThe cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozer
18 viewsA bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozer
18 viewsThe plumber is applying tile grout. (14-Jun-04)dozer
18 viewsThe bathtub will be supported by this brick enclosure.dozer
18 viewsPartially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer
18 viewsThe electrician expounding on all things electrical. (18-May-04)dozer