happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Most viewed - Details
DSC03040.jpg
19 viewsThe entry switch box with 6 groups of wires. On the left is the electrical for a fan. (23-May-04)dozer
DSC04035~1.jpg
19 viewsThe electrical systems feeds the 35 down lights and 5 fans hooked on the ceiling. (18-Jun-04)dozer
DSC04048.jpg
19 viewsPreparing the circuit breaker. (19-Jun-04)dozer
DSC02160.jpg
18 viewsThe cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozer
DSC03025.jpg
18 viewsA bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozer
DSC04021~0.jpg
18 viewsThe plumber is applying tile grout. (14-Jun-04)dozer
DSC04063.jpg
18 viewsThe bathtub will be supported by this brick enclosure.dozer
DSC04073.jpg
18 viewsPartially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer
DSC02161.jpg
18 viewsThe electrician expounding on all things electrical. (18-May-04)dozer
DSC03068.jpg
18 viewsSo they need to get chipped out.dozer
DSC04151.jpg
18 viewsSetting up a switch box for the two water pumps on the outside wall. (29-Jun-04)dozer
DSC02008.jpg
17 viewsPouring cement to form the counter.dozer
122 files on 11 page(s) 6

Debug Info 
Debug Output: show / hide