20 viewsSadly the first electrical guy didn't really do too good a job. For example, here we discover the large socket outlet boxes are set in the wrong orientation. (26-May-04)dozer
|
|
20 viewsThis shows a large socket box with 5 small plugs and a telephone connection. The only problem with these small socket receptacles being so close together is you cannot really use two adjacent plugs, because typically plugs will be a bit too wide. dozer
|
|
19 viewsThe red bricks designate where the sink will go. dozer
|
|
19 viewsA counter section after the red brick enclosure is complete. (14-May-04)dozer
|
|
19 viewsPartial wall tile completed. dozer
|
|
19 viewsFinished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozer
|
|
19 viewsCompleted and tiled shower enclosure base. (20-Jun-04)dozer
|
|
19 viewsCabinet in progress in the large bathroom. (21-Jun-04)dozer
|
|
19 viewsThe plumber finishing off the shower enclosure.dozer
|
|
19 viewsThis is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozer
|
|
19 viewsLarge bathroom bathtub and toilet.dozer
|
|
19 viewsLarge bathroom sink. This is one of those minor annoyances. This sink was placed a little too near the wall which means one needs to bend forward to use it.dozer
|
|