happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Most viewed - Details
DSC04011.jpg
21 viewsLarge bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer
DSC04054.jpg
21 viewsThe sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer
DSC04062.jpg
21 viewsThe large bathroom cabinet. dozer
DSC04129.jpg
21 viewsBathtub tiled in. (27-Jun-04)dozer
DSC05015.jpg
21 viewsSmall bathroom sink.dozer
DSC05038.jpg
21 viewsStainless septic exhaust cover installed. (09-Jul-04)dozer
DSC00114.jpg
21 viewsPVC conduit is run up the wall to house the electrical. (22-Mar-04)dozer
DSC03049.jpg
20 viewsThe kitchen tile expert selecting tiles. (24-May-04)dozer
DSC03166~0.jpg
20 viewsConcrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer
DSC04043.jpg
20 viewsThis shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer
DSC04107.jpg
20 viewsHeavy duty drainage assembly being attached to the bathtub. Note; this is a heavy duty acrylic bathtub.dozer
DSC05035.jpg
20 viewsPrep work for the septic exhaust cover. (08-Jul-04dozer
122 files on 11 page(s) 4

Debug Info 
Debug Output: show / hide