happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Most viewed - Details
DSC03108.jpg
25 viewsThe hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer
DSC03109.jpg
25 viewsSmall bathroom hot and cold water for the shower stall.dozer
DSC03112.jpg
25 viewsSmall bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
DSC03124.jpg
25 viewsThe large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
DSC03149.jpg
25 viewsWater runoff pipes run into the septic like this. (05-Jun-04)dozer
DSC05145.jpg
25 viewsThe official electric meter at the street. (21-Aug-04)dozer
DSC06010.jpg
25 viewsThe completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozer
DSC00103.jpg
24 viewsThe small bathroom with 4" PVC for the toilet.dozer
DSC01132.jpg
24 viewsThe row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozer
DSC03114.jpg
24 viewsThe small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer
DSC03126.jpg
24 viewsUnder the patio runs this PVC which feeds the lighting on the wall and then runs to the pumps. (03-Jun-04)dozer
DSC05012.jpg
23 viewsFinished cabinet section with stainless sink installed. (06-Jul-04)dozer
122 files on 11 page(s) 2

Debug Info 
Debug Output: show / hide