|
Most viewed - Details |
25 viewsThe hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer
|
|
25 viewsSmall bathroom hot and cold water for the shower stall.dozer
|
|
25 viewsSmall bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
|
|
25 viewsThe large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
|
|
25 viewsWater runoff pipes run into the septic like this. (05-Jun-04)dozer
|
|
25 viewsThe official electric meter at the street. (21-Aug-04)dozer
|
|
25 viewsThe completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozer
|
|
24 viewsThe small bathroom with 4" PVC for the toilet.dozer
|
|
24 viewsThe row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozer
|
|
24 viewsThe small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer
|
|
24 viewsUnder the patio runs this PVC which feeds the lighting on the wall and then runs to the pumps. (03-Jun-04)dozer
|
|
23 viewsFinished cabinet section with stainless sink installed. (06-Jul-04)dozer
|
|
122 files on 11 page(s) |
2 | |
|
|
|
|
|
|
|
|
|
|
|