|
Most viewed - Details |
34 viewsLarge bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozer
|
|
32 viewsThis is the raw plumbing in the small bathroom, shown from the door opening counter clockwise. This shot shows the outside drain pipe (3" standing) along with the 2" sink runoff. The other PVC is the entry of hot and cold water.dozer
|
|
31 viewsThis shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozer
|
|
31 viewsThe small bathroom sink plumbing, showing hot and cold water entry and water runoff. dozer
|
|
27 viewsHere is a cement ring is being put in place in one of the septics. (23-Apr-04)dozer
|
|
27 viewsConcrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer
|
|
27 viewsThis electrical in the front on the left of the gate is used to split off the electrical to feed the perimeter wall lighting and the pumps.dozer
|
|
26 viewsThe framed small bathroom. (13-Mar-04)dozer
|
|
26 viewsSmall bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozer
|
|
26 viewsThe electric is feed in from the street to the roof and attaches here.dozer
|
|
25 viewsThe metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozer
|
|
25 viewsA septic being dug. (22-Apr-04)dozer
|
|
122 files on 11 page(s) |
1 |
|
|
|
|
|
|
|
|
|
|
|
|