DSCF4969.JPG
Note the reinfocement for the ground floor slab (mesh) was tied onto the ground beam reinforcement for extra strength.54 viewschiyman
DSCF4901.JPG
Clearing the way for the Concrete truck. Next stage construction materials in the foreground53 viewschiyman
DSCF4924.JPG
I am the proud owner of Brand new concrete mixer53 viewsI bought this in town and had it loaded onto the back of my pickup. Was a bit concerned while driving it to the house especially when I needed to go up some steep hills. The journey took much longer than usual!!chiyman
DSCF4960.JPG
The connection pipe from the toilet to the collection tank.52 viewschiyman
DSCF4952.JPG
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.52 viewschiyman
DSCF4896_resize.jpg
Steel for the Footings placed with Concrete pipes for the below ground sections of the columns supported with yuca poles.51 viewschiyman
DSCF4947.JPG
Backfilling between the ground beams51 viewschiyman
DSCF4946.JPG
Backfilling between the ground beams51 viewschiyman
DSCF4998.JPG
I was very pleased with the quality of the columns - much better than I had anticipated51 viewschiyman
DSCF4962.JPG
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperately51 viewschiyman
DSCF4637_resize.jpg
Another angle on the levelled land awaiting construction in 7 months time - after the rainy season which will allow the land to settle.49 viewschiyman
DSCF4996.JPG
Formwork for the ground floor columns being removed49 viewschiyman