Most viewed - chiyman's Gallery |

First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.67 viewschiyman
|
|

Getting everything straight and levelled before the big concrete pour.67 viewschiyman
|
|

putting the ground beams in place.67 viewschiyman
|
|

The workers camp with excess concrete being used for a place for washing. The workers like to stay in the tent which they regarded as more professional than constructing their own accommodation!!66 viewschiyman
|
|

A view from the farm land of the rear of the house. 1st floor balcony can be seen.66 viewschiyman
|
|
|

Formwork for ground beams62 viewsI checked carefully to ensure that there was sufficient space between the reinforcement and the wooden formwork. Some adjustment was necessary. If the steel dosent have a concrete cover (of sufficent thickness) then it will be exposed to the atmosphere and will corrode. At best this will show as a dirty brown mark on the exterior of the structure and at worst, over time could cause structural failure.chiyman
|
|

Land purchased and area leveled ready for construction after settling.61 viewschiyman
|
|

Formwork and reinforcement placed and ready for concrete pour the next day61 viewschiyman
|
|

The Electric man came to give us power!60 viewschiyman
|
|

Bathroom drainage connections placed befor pouring the ground floor slab60 viewschiyman
|
|

Getting everything straight and levelled before the big concrete pour.59 viewschiyman
|
|
160 files on 14 page(s) |