First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.67 viewschiyman
DSCF4907.JPG
Getting everything straight and levelled before the big concrete pour.67 viewschiyman
DSCF4920.JPG
putting the ground beams in place.67 viewschiyman
DSCF4921.JPG
The workers camp with excess concrete being used for a place for washing. The workers like to stay in the tent which they regarded as more professional than constructing their own accommodation!!66 viewschiyman
DSCF5154.JPG
A view from the farm land of the rear of the house. 1st floor balcony can be seen.66 viewschiyman
DSCF4911.JPG
Lunch Break65 viewschiyman
DSCF4935.JPG
Formwork for ground beams62 viewsI checked carefully to ensure that there was sufficient space between the reinforcement and the wooden formwork. Some adjustment was necessary. If the steel dosent have a concrete cover (of sufficent thickness) then it will be exposed to the atmosphere and will corrode. At best this will show as a dirty brown mark on the exterior of the structure and at worst, over time could cause structural failure.chiyman
DSCF4635_resize.jpg
Land purchased and area leveled ready for construction after settling.61 viewschiyman
DSCF4934.JPG
Formwork and reinforcement placed and ready for concrete pour the next day61 viewschiyman
DSCF4916.JPG
The Electric man came to give us power!60 viewschiyman
DSCF4951.JPG
Bathroom drainage connections placed befor pouring the ground floor slab60 viewschiyman
DSCF4904.JPG
Getting everything straight and levelled before the big concrete pour.59 viewschiyman