The larger white dog was in fact a male. I think the puppy was hungry. The dog then urinated on the puppy!! which made the construction worker owner rather cross!30 viewschiyman
Finishing the concrete pour of the First Floor slab. All concrete was lifted by the bucket load to the first floor using the pully. At about 10kg a load the number of movements was considerable!!30 viewschiyman
Roofing material and steel in the background.28 viewschiyman
The roof construction wee under way - required a lot of Yuca poles as scaffolding28 viewschiyman
Seems like a lot of steel in that roof. Shame they didnt follow my original design - would have saved about 25% of the steel required - what can one do when you are not there to supervise directly?28 viewschiyman
Platforms for construction of the roof which was very high - about 5m for eaves to top ridge. I wanted to have the roof as the mail recognisable feature of the house and was prepared to pay the additional cost for this.28 viewschiyman