DSCF4923.JPG
Ground beams being placed in position on top of the below groung columns - lots of water applied to consolidate the footings.91 viewschiyman
DSCF4922.JPG
The Electical Authority man with his wife - they were perfectly charming. He did his work very professionally and also helped with the breaker installation. Thanks.87 viewschiyman
DSCF4909.JPG
A happy constructor with a Pepsi!85 viewschiyman
DSCF5046.JPG
Finishing the first floor slab concrete83 viewschiyman
DSCF4912.JPG
Footings poured and concrete pipes cropped to the correct level for further constuction and attachment of the ground beams. This method saved a lot of time.81 viewschiyman
DSCF4913.JPG
Ditto previos photograph78 viewschiyman
DSCF4898_resize.jpg
Footing in place, supported on clay bricks to allow concrete to flow arround the pad. Pad overall dimension 1.5m x 1.5m steel cage dimension 1.3m x 1.3 m.76 viewsI had to complete the first stages of the construction quickly so decided to use the conceret pipes to form the below grade section of the columns. This allows backfilling of the footing as soon as the concrete had hardened and avoided the need to construct wooden forms.chiyman
DSCF4900.JPG
Clearing the way for the Concrete truck. (The chaps who had dug the holes had left the soil right by the edges of the holes).74 viewschiyman
DSCF4899_resize.jpg
Another view of the footings before the concrete pour.74 viewschiyman
DSCF4915.JPG
Backfilling and cutting trench for the ground beams.70 viewschiyman
DSCF4914.JPG
Backfilling the footings the next day68 viewschiyman
DSCF4910.JPG
Lunch Break67 viewschiyman