Ready to install rebar89 viewsMeasured out the exact position with the builders line, in preparation for rebar column install.Max&Bee-in-CM
|
|

Busy ladies89 viewsThe ladies are busy carrying materials.Max&Bee-in-CM
|
|

Making stakes89 viewsSharpening the stakes - not for vampire hunting, but for supporting the formwork in place.Max&Bee-in-CM
|
|

First beam mold89 viewsThe first beam form-mold they installed.Max&Bee-in-CM
|
|
|

Inside the rebar column88 viewsLooking down inside the rebar and the concrete column.Max&Bee-in-CM
|
|

View from the entrance corridor88 viewsStanding just inside the entrance, on the left is the master bedroom.Max&Bee-in-CM
|
|
|
|

Jacking up the sagging beam88 viewsA few car jacks were used to straighten out the sagging beams, before the truss structure was welded into placeMax&Bee-in-CM
|
|

Footing rebar87 viewsAlot of rebar made in a few days by 3 or 4 people, impressive.Max&Bee-in-CM
|
|

Foundation holes87 viewsThey made a rock/soil mold for the concrete pour at the bottom of the hole.Max&Bee-in-CM
|
|