|

Most viewed - Max&Bee-in-CM's Gallery |

Rebar in pipes48 viewsMeasure out the size to make sure the rebar squares fit tight.Max&Bee-in-CM
|
|

Front right boundary peg48 viewsThis is the front right of the land, with the hole dug for the fence post. The electricity pole will be placed inside the fence.Max&Bee-in-CM
|
|
|

Right side of property46 viewsLooking from the rear to the front.Max&Bee-in-CM
|
|
|

Hole #245 viewsThe second hole is dug out by hand, size is 1 m cubed.Max&Bee-in-CM
|
|

Building the rebar frame44 viewsA fame 3 metre high is build for the telescope pierMax&Bee-in-CM
|
|

Rear right boundary peg42 viewsThis is the boundary peg at the rear right, looking along the rear of the property. All the post holes have bee dug at the back already.Max&Bee-in-CM
|
|

Rear rigth boundary peg42 viewsA stronger concrete posts will be built here, to give extra support for the fence on the corners.Max&Bee-in-CM
|
|

Hole #141 viewsThe hole is dug for the telescope pier.Max&Bee-in-CM
|
|

Metal plates41 viewsThe metal plates in the back of the car, looking for a drill shop now. Need to drill 3 plates.Max&Bee-in-CM
|
|

Drill mold41 viewsThe wooden board for the drill holes.Max&Bee-in-CM
|
|
307 files on 26 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
25 |
|

|
|
|