happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Max&Bee-in-CM

Most viewed - Max&Bee-in-CM's Gallery
IMG_5569.JPG
Rainbow70 viewsA rainbow appears over the first few postsMax&Bee-in-CM
IMG_9650.JPG
Came back from a trip back to Oz, the roof wa almost finished70 viewsOr so we thought....Max&Bee-in-CM
IMG_0423.JPG
The stacking looks really cool!70 viewsMax&Bee-in-CM
IMG_0937.JPG
Trusses finished70 viewsMax&Bee-in-CM
IMG_2926.JPG
drilling the hole69 viewsthe hole was drilled to 60 metres, at a cost of 36,000 baht.
it took about 3 days start to finish for the job.
Max&Bee-in-CM
IMG_4437.JPG
Carying another column rebar69 viewsMax&Bee-in-CM
IMG_6721.JPG
First beam attached69 viewsMax&Bee-in-CM
IMG_0460.JPG
Roofer at work69 viewsMax&Bee-in-CM
IMG_4926.JPG
Macro doing backfill68 viewsHave to fill the foundation holes with soilMax&Bee-in-CM
IMG_6908.JPG
4000 or so tiles sit waiting68 viewsMax&Bee-in-CM
IMG_0419.JPG
View through the front as the tiles are stacked68 viewsMax&Bee-in-CM
IMG_1095.JPG
Working on the roof68 viewsMax&Bee-in-CM
307 files on 26 page(s) 19

Debug Info 
Debug Output: show / hide