electricity company installed the single phase meter73 viewsstill deciding whether to get 3 phase power, the quote was for 68,000 baht, or to go ahead with single phase.Max&Bee-in-CM
|
|
|
|

Work site73 viewsLots of rebar braces done and ready to be used.Max&Bee-in-CM
|
|
|
|
|

All colunns dried73 viewsReady for soil to be back filled.Max&Bee-in-CM
|
|

Lots of water73 viewsThe front of the land got flooded, this shows clearly where the depressions in the land are.Max&Bee-in-CM
|
|

Tile installation stops before the front is finished to begin repair work on the sagging73 viewsMax&Bee-in-CM
|
|
|

heavy escavator72 viewsthe soil man needed to bring in a "big macro" to take out some stubborn tree stumps.Max&Bee-in-CM
|
|