Most viewed - Basics
DSC01101.jpg
20 viewsA tile mesh pattern is created above the sand flooring.dozer
DSC02018.jpg
20 viewsWorking on the front roof valley of the house. (28-Apr-04)dozer
DSC02030.jpg
20 viewsFront valley being completed. (30-Apr-04) dozer
DSC00116.jpg
20 viewsStarting to frame a bedroom door. A piece of 2 * 4 is used to keep the door in place.dozer
DSC05095.jpg
20 viewsCurtain installation. (29-Jul-04)dozer
DSC01089.jpg
19 viewsA stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer
DSC01103.jpg
19 viewsThe still wet surface is 'roughed' in preparation for tiling. (20-Apr-04)dozer
DSC00150.jpg
19 viewsThe stucco is applied in coats. This is a rough coat. (02-Apr-04)dozer
DSC00100~0.jpg
19 viewsThe roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozer
DSC02019.jpg
19 viewsThe tile is laid over aluminium drainage sheets in the valley section. dozer
DSC02033.jpg
19 viewsRepair work on valley in progress.dozer
DSC02090.jpg
19 viewsPatio roof section along in foreground. (10-May-04)dozer