happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Basics

Most viewed - Basics
DSC01070.jpg
21 viewsThe foundation posts are finished off by having decorative corners added. (19-Apr-04)dozer
DSC01153.jpg
21 viewsThe traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer
DSC00108~0.jpg
21 viewsThis area shows the entryway (on the left) as well as the front bedroom. (22-Mar-04)dozer
DSC00111.jpg
21 viewsA piece of wood is extended from the roof metal to allow the facia board to be attached. dozer
DSC00131~0.jpg
21 viewsRoof truss with attached facia board and drainage aluminum at the valley.dozer
DSC00137~0.jpg
21 viewsA wall section of the rear bedroom along. There has been additional metal placed in the roof truss which is now complete. Notice the two heavy gauge 4 * 2 metal beams shown in this shot. (28-Mar-04)dozer
DSC00142.jpg
21 viewsIn the process of placing roof tiles on the house. dozer
DSC00144.jpg
21 viewsRoof tiles being set on the roof. dozer
DSC02134.jpg
21 viewsThis cabinet door shows the use of anchor nails. Anchor nails are inserted at about 10 centimeter intervals and will be used as a strengthening anchor to the frame of the surrounding wall surface. (13-May-04)dozer
DSC04047.jpg
21 viewsA close up of the top and bottom sliding hinge used throughout. I think these look better than the side mounted hinges. (19-Jun-04)dozer
DSC04075.jpg
21 viewsA mounted inside solid wood door prior to being varnished.dozer
DSC04130.jpg
21 viewsThe glass needed to be cut for the grate windows with a glass cutter. (27-Jun-04)dozer
133 files on 12 page(s) 6

Debug Info 
Debug Output: show / hide