27 viewsScreens and metal security grates being installed. (08-Jul-04)dozer
|
|
26 viewsThis shows the patch done on the inside of the roof valley but it is a little hard to see. Basically instead of one piece of aluminum an additional piece was added on top which sets on top of the 1 * 1 cross supports. The whole idea here is to add more angle and prevent any water entry during a rainy storm with high winds. (29-Apr-04)dozer
|
|
26 viewsAn embedded anchor nail. These nails are put in the door frame at regular intervals (about 15 centimeters apart) and used to anchor the frame to the wall.dozer
|
|
25 viewsBathroom window framed. Notice the cement base below the window and the use of red brick above.dozer
|
|
25 viewsThis shows a repair job on the clear glass bricks installed in the large bathroom. The first go round there was not any cement used between the bricks. (09-Apr-04)dozer
|
|
25 viewsThe windows being prepared for the top and bottom hinges. (18-Jun-04)dozer
|
|
25 viewsAttaching a window to the frame.dozer
|
|
25 viewsFitting a door in place. (22-Jun-04)dozer
|
|
25 viewsAll of the wood windows have an opening mechanism as pictured here. The window can be opened and closed without having to open the screen. The window is opened by pushing the rod, and closed by pulling it. There is also a locking mechanism on the top of the windows (not shown) which allows the windows to be locked without opening the screen.dozer
|
|
24 viewsWall section - notice how there is a base above and below the window and red bricks are used to make the upper roof support. (28-Mar-04)dozer
|
|
24 viewsThe stucco being smoothed in the finishing coat.dozer
|
|
24 viewsMain roof section nearing completion. (27-Apr-04)dozer
|
|