14 viewsThis shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozer
14 viewsHere is the front bedroom partially tiled. dozer
13 viewsEach tile is carefully tapped into place. (14-May-04)dozer
12 viewsAfter the cement is dry, tile grout is applied. The grouts come in various colors to match the shade of the tile. (24-May-04)dozer
10 viewsHere a border or 'skirt' is being laid out. The wall is scored to allow for maximum adhesion. The skirt should ideally be done before the wall has been painted. (14-Jun-04)dozer
10 viewsFinishing off a detail section is a doorway.dozer