happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Basics

Most viewed - Basics
DSC00105~0.jpg
16 viewsPartially finished roof truss, rear side of house. dozer
DSC00106.jpg
16 viewsThis shot also shows the facia board (brand facolia, a synthetic material) along with an aluminum preformed strip for rain water. This drainage strip is inadequate in size and leads to problems later. It has a width of about 20 centimeters. (22-Mar-04) dozer
DSC00107~0.jpg
16 viewsMore roof sections. This shot shows the covered parking area, and entryway areas. (22-Mar-04)dozer
DSC02046.jpg
16 viewsRepaired roof valley. dozer
DSC04155.jpg
16 viewsThis is the final fix to the valley on the right side of the house. Added flashing material is being added. (30-Jun-04)dozer
DSC01056~0.jpg
16 viewsThis shows the frame after stucco has been partially applied. (17-Apr-04)dozer
DSC01120.jpg
15 viewsGreat room nearly complete.dozer
DSC03130.jpg
15 viewsA smoothing tool is used to correctly level and slope the patio. (03-Jun-04)dozer
DSC05121.jpg
15 viewsFinished roof, view from rear.dozer
DSC01105.jpg
14 viewsPour close up. (21-Apr-04)dozer
DSC03145.jpg
14 viewsFor outside surfaces that will not be tiled, they can be done is a semi-smooth, non slippery, finish. (04-Jun-04)dozer
DSC02111.jpg
14 viewsAfter the floor is poured a layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer
133 files on 12 page(s) 10

Debug Info 
Debug Output: show / hide