29 Jan. 2009204 viewsThe floor panels were delivered today. We have 3 different lengths to span the areas needed.pklongball
29 Jan. 2009204 viewsThe install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongball
3 Feb 2009204 viewsSome of the floor panels are now in place in the back area of the house.pklongball
17 March 2009204 viewsSparky and helper installing a pipe and boxpklongball
26 March 2009204 viewsThis shot is Sparkie's right hand man installing a section of the wireway metal chase we decided to use instead of the standard conduit and boxes. This chase will join all areas of the ceiling area together to allow cables to be pulled to any conduit stubs from the main load center as well as travel to other points.pklongball
June 26204 viewsThe kitchen with some color added. Mrs picked a yellow paint scheme with some green tile and smaller yellow and white accent tiles.pklongball
29 Jan. 2009203 viewsView just after the install of the tubing. A first application of the chemical was applied using a high pressure sprayer.pklongball
26 Feb. 2009203 viewsThe back of the housepklongball
28 April203 viewsDifferent view of the septic tank and some of the early pipe work. You can also see the trench that will have a pipe to carry the grey water and septic water away.pklongball
2 May203 viewsI popped the cover so you can see how simple a device this "grease"trap is. But it IS a necessity to contain the "stuff" wifey washes down the drain. Edit here: Can anyone tell me if the metal strainer basket is installed correctly? I think it looks backasswards.pklongball
August 12203 viewsTake a look here and see the 2200 liter tank and the water filter. I added this filter to clean up the sediment in the city water supply. pklongball
15 April202 viewsA little closer view of a recently plastered wall. They really do a nice job.pklongball