23 May 200985 viewsCarpenter number 2 drilling pilot holes into the wood frame for the outside veranda trim. pklongball
2 June85 viewsThe tile grout lady. She does about 80% of the finishing workpklongball
June 1485 viewsHere we have today's view into the master bath and the shower zone with the built in bench added for sitting down and enjoying a relaxing shower. A shower unit will be installed near this benchpklongball
June 1585 viewsHere we have the master bath vanity about 60%. pklongball
June 2685 viewsBack veranda with part of the railing in place and stainedpklongball
June 2685 viewsLooking down the front steps toward the newly sand washed walk way and the side yardpklongball
June 2885 viewsDirt man and Mrs talking over what we want done.pklongball
18 April84 viewsAnd again an inside look up to the gables and the application of the screening and Shera.pklongball