Jan.29,201089 viewsThe water,sand, granite that was coming out of the bore. Almost finishedpklongball
|
|
Jan.29,201089 viewsThe mess was everywherepklongball
|
|
19 May88 viewsAnother view of the two cable feeders. Before the needed length was pulled in , tile man 1 went under the house to help pull. So we ended up with 3 pulling and one feeding. But in about 20 minutes or so it was done.pklongball
|
|
23 May 200988 viewsAnother one of the paint crew up on the back roof and starting the gable finishing.pklongball
|
|
2 June88 viewsLooking from the kitchen door to the front door and the tile folks finishing their workpklongball
|
|
June 2888 viewsHere is a view of the JCB loading the small dump truck with the junk dirt and other construction debris and weeds.pklongball
|
|
Jan.28,201088 viewsThe crew came back in the morning of day 2 to begin the drilling. It will take one day to drill down about 20 meters or so into the soft dirt, sand and gravel.pklongball
|
|
Jan.27,201088 viewsThe opening in the wall was just barely big enough for the rig.pklongball
|
|
Jan.29,201088 viewsDay two the crew was now drilling into the granite about 25 meters down.pklongball
|
|
22 May87 viewsThe second view of the black tile layout for the stairs. Not so cute from this angle as the tile are just sitting sort of randomly at this point.pklongball
|
|
June 2387 viewsHere is Tile man 1's main helper. She does all the finish work after tile man sets the tile. In this case the granite install cleaning and finish groutpklongball
|
|
8 May86 viewsThe back stairs are now built and waiting for the finishing touchpklongball
|
|