|
Most viewed - pklongball's Gallery |
|
Jan.28,201090 viewsThe work is boring and dirty and leaves a big mess in the yard.pklongball
|
|
Jan.28,201090 viewsOne man ran the operation and the second man was the "rough neck" that did all the laor of adding drilling pipe and checking the leavings coming from the bore.pklongball
|
|
18 May89 viewsSparky is feeding into the 2 inch pipe a piece of stiff wire that will be used as the pulling wire for the NYY cablepklongball
|
|
19 May89 viewsHere we can see the NYY cable and the now attached pull rope.pklongball
|
|
21 May89 viewsThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongball
|
|
31 May89 viewsThe kitchen floor is about 80 percentpklongball
|
|
June 1289 viewsNow the second bath floor is almost finished. Just some grout work to do.pklongball
|
|
June 2889 viewsHere is the first load of gravel that will line the driveway. I am expecting two trucks for sure and maybe a third. The dirt man will decide if the 3rd is needed when he levels it and compacts it.pklongball
|
|
|
Jan.27,201089 viewsOnce in place then the set up of the rig beginspklongball
|
|
|
838 files on 70 page(s) |
|
|
|
|
|
52 | |
|
|
|
|
|
|
|