Most viewed - pklongball's Gallery |
11 October91 viewsThis is the last are of sod laid about 3 days ago. Its been raining since and the Garden man has other work to do now.pklongball
|
|
Jan.27,201091 viewsThe location for the borehole was marked so the first order of business was to open a section of the wall and drive the drilling rig into the yard.pklongball
|
|
Jan.30,201091 viewsThe area after the well is almost finishedpklongball
|
|
|
15 April90 viewsLooking up at the gable vent work in progress. This one is over the front entry area.pklongball
|
|
29 April90 viewsHere we have the stairman working on the back veranda stairway. First was a concrete pad. Now the first course of brick to build the first step.pklongball
|
|
18 May90 viewsThis part of the trench heads to the house under the foundation wallpklongball
|
|
19 May90 viewsHere we have Sparky just starting to feed the 4 conductor NYY cable into the PE pipe. The 16mm2 cable is 65 meters long and very heavy.pklongball
|
|
19 may90 viewsSparky started feeding in the NYY cable and his helper was under the house pulling it. After about 15 meters the cable stopped and his mate was almost spent trying to pull the cable alone. Sparky enlisted the help of the tile installers. In this view tile man 1 is helping to feed cable and tile man 2 went under the house to help pull.pklongball
|
|
June 1290 viewsAnother inside view of the second bath and the floor and now partially built vanity for the sink.pklongball
|
|
June 3090 viewsHere we have the Electric man wiring the first of two lamp fixtures with the electronic ballasts need to light the lights.pklongball
|
|
June 3090 viewsA little closer look at one of the down lightspklongball
|
|