|

Most viewed - pklongball's Gallery |

18 May94 viewsMore trench on its way to the housepklongball
|
|

18 May94 viewsThe 2 Sparkies preping the PE pipepklongball
|
|

July 794 viewsMaster bedroom fan unit in placepklongball
|
|

18 April93 viewsIf you take a close look here you can see the crew has started adding the insect net and the Sherawood to the gable/eaves now after they built the wood vents.pklongball
|
|

5 May93 viewsHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongball
|
|

8 May93 viewsHere we have Sparky number 2 getting a length of flex conduit ready for install.pklongball
|
|

19 May93 viewsIn this shot Sparky is guiding the pull rope into the PE pipe. They started with a pull wire/cable and attached a pulling rope and attached this to the NYY cable.pklongball
|
|

June 1593 viewsThe tile crew is working outside today getting the walk ready to apply the sand wash. We decided on not using tile herepklongball
|
|

June 2293 viewsMaster bath vanity with the Homewood doors in place and almost completepklongball
|
|

June 3093 viewsOne of the many switches used in our house. I have 3 different types. Single, 2-way and 3-way for different light control purposespklongball
|
|

11 October93 viewsLonger shot showing another 100 plus meters yet to be donepklongball
|
|
|
838 files on 70 page(s) |
 |
 |
 |
 |
 |
49 |  |
 |
 |
 |
|

|
|
|