Most viewed - pklongball's Gallery |
July 999 viewsLong shot of the panel and the connection phase. All connections will be made and tested before he calls for the final inspection and the meter installpklongball
|
|
Jan.30,201099 viewsOnce it's all connected the boys made a quick test to be sure the pump would operate and ran it to see how much flow we had. They ran the pump a good 30 minutes with no shortage of water.pklongball
|
|
5 May98 viewsAnother view of the newly pulled wire for the bedroom down lights and fanpklongball
|
|
23 May 200998 viewsThey started with long pieces of wood framing, cut to length and nailed into a box shape then cut the spokes and add them to the box.pklongball
|
|
July 2198 viewsHomeworks delivered our new bed on schedule but we could not let them set it up yet as the built in people have the bedroom full of cabinets and tools and other debris. We ended up setting up the bed ourselves late the night of the 25th after the cabinet people left.pklongball
|
|
Jan.30,201098 viewsAnother view of the pressure control showing the built on pressure gauge. Nice to have.pklongball
|
|
June 2697 viewsInterior view and now we can see the base boards that have been installed. Nice wood not the usual conwood stuffpklongball
|
|
July 697 viewsSide of the house after the rain last night. More standing water but not too bad herepklongball
|
|
July 797 viewsHere is the empty box from one of the fans. We bought a brand called Starlight. I was actually looking at the Compass East brand called Sunlight and the rep a Homeworks talked my wife into this brand. All the units have a 10 year warranty on the motor so we shall see how they work I guess.pklongball
|
|
11 October97 viewsThese two areas left and right of the drive were laid first. About 2 weeks ago. It worked perfect as the rain has been watering it almost daily now and I think we had to water once or twice. pklongball
|
|
|
|