|
Most viewed - pklongball's Gallery |
|
July 7102 viewsThe out door fan unit now in placepklongball
|
|
11 October102 viewsAnother view of the new grasspklongball
|
|
11 October102 viewsThis view of the new landscaping is from the back yard along the side to the front. This sod was laid about 3 to 6 days ago. Had great rain the last couple of days to keep it wet.pklongball
|
|
|
Jan.30,2010102 viewsDay 3 they crew came back with the Franklin 1 hp pump and control, the automatic pressure switch and several lengths of blue PVC. They wired up the pump and attached the blue pvc in 4 meter lengths and dropped the pump down the hole. pklongball
|
|
18 April101 viewsAnd from another angle you can see the Sherawood has been applied to the upper gable. I think it will look very nice when complete.pklongball
|
|
21 April101 viewsNow some work has started on the back veranda stairway. A base layer of concrete was poured today.pklongball
|
|
June 22101 viewsThe view today. Roof steel on and painted, tile waiting to install and one wall completedpklongball
|
|
July 7101 viewsThe main room fan has this rotary control switch instead of the pull chain on the fanpklongball
|
|
|
Jan.30,2010101 viewsHere the creww is connecting the pvc piping. No yellow for the electric part just blue for all of it. I was not thrilled with the electric piece of the work and I will make "my" changes soon now that we have the system operatingpklongball
|
|
838 files on 70 page(s) |
|
|
|
|
|
45 | |
|
|
|
|
|
|
|