June 22108 viewsFrom the veranda the view of the pump room and waitng for the tile and floorpklongball
July 6108 viewsOutdoor location of the master bedroom AC compressor. This spot will be filled with concrete for the pad areapklongball
August 12108 viewsThe front wall and gate are now almost complete. By the end of this day the gate is being locked for the first time.pklongball
18 April107 viewsFull view of the new door framepklongball
18 April107 viewsWhat else but another view of the gables. I guess some may think I'm obsessed with this but it cost a lot to build this roof and gables versus the traditional hip roof. A lot!pklongball
8 May107 viewsMore conduit, raceway and wires. pklongball
20 May107 viewsI wanted to show the stubbed up end of the third PE pipe that Sparky ran. This pipe will have the poweer for the wall lighting and automatic gate opener.pklongball
June 14107 viewsThis is a view of the pumphouse construction today.pklongball
June 28107 viewsThe wood crew is finishing the wood fascia boards before the tile applicationpklongball
July 21107 viewsHere we have Sparky working near the front gate adding the wiring for the wall lighting.pklongball
11 October107 viewsShot of the layout for the walkway that will be laid soon from back steps to laundry and side of house.pklongball
27 October107 viewsOverview of the new concrete walkpklongball