June 6113 viewsWork has moved up and now we have the columns formedpklongball
June 30113 viewsA box full of breakers for the load center. Note not all the same amp ratingpklongball
Feb.13,2010113 viewsThis is a one only shot of the boys that drilled the well for us now adding the piping for the water and electric connections. The yellow piece of hardware is the pressure flow switch that will activate the well pump when a tap is opened. It also can shut down the pump if no flow is detected to save the pump motor.pklongball
9 May 2009112 viewsSparky and Sparky 2 have now prewired most of the house. The ceiling lights over the main entry and veranda are shown herepklongball
2 June112 viewsHere we are on another day and now the pump room crew is busy bending 12mm rebar for the beams for the walls and floorpklongball
July 6112 viewsDouble width pad area for the two compressorspklongball
11 Jan 2009111 viewsOverview of the house site after hole fillingpklongball
1 April111 viewsA view of the first coating of cement to start squaring up the window openingspklongball
23 May 2009111 viewsThe front door frame has been cleaned and sanded a bit and a coat of stain has been applied. All wood door frames got this treatment today.pklongball
June 28111 viewsAnd another angle to look at. I try to take a pic from different angles so the viewer can get different perspectivespklongball
August 12111 viewsA look from the front veranda at the new wall and gate and gravel drivepklongball