|
Most viewed - pklongball's Gallery |
5 May142 viewsThis part of the living room ceiling shows the 30 cm step from the lower to higher ceiling. The larger 30cm step was decided to allow install of the ceiling aircon unit later.pklongball
|
|
Dec. 4th142 viewsAnother view of the front yard with the new grass and treespklongball
|
|
Column marking continues141 views16 Dec.'08pklongball
|
|
Trenching machine141 views10 Jan 2009 This is the trenching machine. One man, one pick and no shoes.pklongball
|
|
4 April141 viewsAnd now the back left corner view showing us the long roof valley that was done very well in my opinion. The tile fitter spent a lot of time cutting the tile to get a good tight, straight line down this valley.pklongball
|
|
15 April141 viewsThis is the last day of Songkran and we actually have 6 or 7 workers on site. Three of them are now adding the wood work to the gables and in this view the vents are being built.pklongball
|
|
|
5 May141 viewsToday they finished the second trench down the side from the septic tank to the street drain. I hope tomorrow the pipe will be installed.pklongball
|
|
Column centers140 viewsAfter the initial measuring and stringing the nylon line Khun Apple and crew find the approximate centers for the columns
15 Dec.'08pklongball
|
|
Ready to build on140 viewsThis is the final view of the plot before any work on the wall or the house. We have a 50 percent share of that electric pole in place.
Nov.'08pklongball
|
|
2 Jan. '09140 viewsThis is the view today. The builder brought in the needed equipment for the foundation concrete mixing. Lumber, sand, gravel and other items. First step was to line the bottoms of the holes with a layer of concrete to place the footing rebar on. This process happened over the weekend in preparation for the raising/blessing on Monday the 5th.pklongball
|
|
Blessing Man140 views5 Jan 09 After the ceremony of praying over the food table and raising the columns Blessing Man sits in solitude in the middle of the site and makes some final chants and prayers during the first part of the pouring activity.pklongball
|
|
838 files on 70 page(s) |
|
|
|
|
|
27 | |
|
|
|
|
|
|
|