22 Jan 2009157 viewsThis was a hard 4 hours of work and the pouring crew never took a water or food break that I saw. We bought lunch today!pklongball
Friday the 13th157 viewsScree ding (spelling?) the fresh concretepklongball
1 April157 viewsHere is Sparky patching some work around the boxes in the wallpklongball
4 April156 viewsFrom the left front view we can see the roof gable is the next finish that needs to be done.pklongball
26 Jan. 2009155 viewsAnother day on the job and there is work to be done.pklongball
June 28155 viewsOne of the 4 casement windows in the bedrooms. Two left swing and two right swing. Double handle locks on each window.pklongball
Rebarman 2154 views4 Jan 09 Placing one of the cages into a holepklongball
26 Jan. 2009154 viewsThe site on Monday after 3 days of watering and curingpklongball
June 26154 viewsHere we have a 3mm etched glass window in the frame above the main door. Mrs thought is was a nice touch. I'm mixed at this point. This is looking from the outside to in.pklongball
Dec. 4th154 viewsAnother view of the back from the opposite side. Looking more green but a real pain to keep it watered as of now no watering system and all done by hand/hose.pklongball
First footing153 views5 Jan 09 This is the first footing poured. 30 more to go.pklongball
Day 21 Starting to form the lower column153 viewsWell they have just a few of the footings poured and already have started to form around the rebar on the poured footings for the next piece of the puzzle. This piece is the lower part of the column that will reach to ground level and just above.pklongball