1 April164 viewsSome boxes that are installed before the walls in the kitchenpklongball
5 May164 viewsThe septic tank is now half buried and the newly dug trench from the street comes to the drain box. I need to get them to be sure that no water from any drain line in the house can drain to the back of the land so some sort of blocking will have to be placed in the pipe thats heads and slopes to the back.pklongball
22 Jan 2009163 viewsA view of the forms and after they are filled.pklongball
June 28163 viewsThe double casement window we decided on for the kitchen window. This one may have been a poor choice but time living in the place will really answer this question.pklongball
Plot cleared second time162 viewsThe seller would run a machine around the project area to keep the jungle down to a manageable size before transfer.
22 Jan 2009162 viewsA closer look at the pour crew hard at it.pklongball
21 April162 viewsBack view of the place as of todaypklongball
28 April162 viewsThese two water men are installing the cold supply lines. White shirt is the bossmanpklongball
23 March 2009161 viewsThis pair of boxes will have a plug and switch set up so we can plug in a bedside light and switch it on/off without struggling to find the lamp switch.pklongball
27 May161 viewsAnother shot of the wood trimpklongball
Rebar cage position160 views4 Jan 09 Rebar man sets one of the 31 rebar footing cages in place pklongball