26 March 2009187 viewsAnd again some arrows point to another section of raceway and the method to hang it. Some holes are drilled into the steel of the roof and they secure it with big "pop" rivets. This will make his cabling job a breezepklongball
21 March 2009186 viewsWe are looking out the living room window opening.pklongball
23 March 2009186 viewsHere we have a pair of wall boxes. One is for a duplex plug and the other for the TV/Tel cables. They each have a respective conduit running up the wall cavity.pklongball
26 March 2009186 viewsAnother day and more of the roof tile is completed. Almost finished nowpklongball
1 April186 viewsKitchen wall electrical. Boxes for the plugs of the various appliances and direct wire for the oven and the utility plugs.pklongball
29 April186 viewsHere we see the one added personal touch we have in the master bath. We will have 2 sets of mixer valves. The one to the right in the photo is a normal mixer valve location with a rain shower head and hand held sprayer. The 2nd one on the left is another mixer and hand-held location down lower on the side wall and near where a sit down bench will be built. This will be nice for those days when you really want to scrub the feet or when I get too old to stand under the rain head. pklongball
July 10186 viewsHere we have the master bath shower unit installed. This is a Hang Co unit. Combo rain head and hand held sprayer.pklongball
26 Jan. 2009185 viewsStripping off all the wood forms is next on the list to get the site ready for the floor panels.pklongball
21 March 2009185 viewsBack view of house and roof with the tile.pklongball
15 April185 viewsIn the bedroom area one of the lady plasterers is applying the finishing touches to the new coating.pklongball
June 26185 viewsHere is a shot of the living room front slider.pklongball
13 Jan 2009184 viewsThe Ladies of the Beamteam hard at work.pklongball