1 April191 viewsHere we have one of the roof valleys after it's finished. Nice looking job of cutting and fitting the tilespklongball
June 14191 viewsKitchen window frame above the new counter built inpklongball
6 March 09'190 viewsView of the almost completed roof steel and a new stack of Q-Con blockspklongball
21 March 2009190 viewsI included a view of the pre-wired aircon so I can remember where the wires and pipes are located for future needspklongball
26 March 2009190 viewsA shot here of the now installed raceway but before the conduit is connected to the bottom of the channel with bushings.pklongball
15 April190 viewsOne of the crew getting ready to make a batch of bread? Preparing the hopper for the plaster is what she is doing.pklongball
June 14190 viewsToday I decided to shoot a few pics of the window frames before the installation of the windows. This is the second bedroom area.pklongball
19 March 2009189 viewsWork takes a break as we brought several bunches of bananas and they ladies were passing out to the crew.pklongball
26 March 2009189 viewsHere we have the start of installing the wireway. We are using 2 x 4 by 2 meter sections. These are connected to each other as needed to form the raceway for all the power cabling. Various hand and electric tools are used in the process of assembling the sections.pklongball
28 March 2009189 viewsToday the main panel is installed and all the conduits are in place both up to the raceway for the feeder cables and down under the floor for the main supply cables and the feeders to and from the car park panel. We have added a small box next to the panel that will have the RG 6U cables (TV & True) and telephone cables in and out.pklongball