19 March 2009195 viewsThe walls are going up and the roof tile is also going on at the same time. No hard hats available.pklongball
21 March 2009195 viewsThe lady brickie is starting to raise the walls in the bedroom over the now poured lintel. There will be two casement windows in this wall.pklongball
23 March 2009195 viewsThe start of the electrics includes switch boxes. In this case 4 boxes near the front door to control lights in the house and on the veranda and also the car parking area. You can see the traditional method of mounting the box on a horizontal plane.pklongball
15 April195 viewsThe back veranda and the plaster work they just finished.pklongball
July 10195 viewsThe sit down shower is also a Hang unit. The Towel bar/rack and wall hanger also Hangpklongball
26 March 2009194 viewsSo we come to the panel with no cover and no breakers installed. This is a 3 phase panel in case anyone is wonderingpklongball
26 Feb 2009193 viewsAnother view of some of the steel work. I am surprised at how much cutting and fitting needs to be done. But these guys are up to it and from my perspective they are doing a great job.pklongball
19 March 2009193 viewsSo we had a good bit of work on the tile today. I would say about 3 days should get the majority of tile in place.pklongball
26 March 2009193 viewsIn this shot I am pointing some added arrows to the now installed wireway. Sparky is doing a fine job to this point in how he is going about the install of my wiring.pklongball
28 April193 viewsThe start of installing the drain lines in one bathroompklongball
June 12193 viewsMore sanding and finishingpklongball
June 22193 viewsToday's view of the cabinets waiting now for the wall painting and tiling.pklongball