609 viewsFront view of house after painting completedRick B
568 viewsA typical footer and column placed on top of a single pile.Rick B
Upper Roof Nearing Completion554 viewsAll but the edge tiles over the front roof are now installed on the upper roof. Second floor block work and window/door frames are also complete.Rick B
531 viewsFloor slabs (pan peun) are being laid for the first floor. These slabs will be covered with wire mesh and an additional 5cm of poured concrete.Rick B
529 viewsPreparing for concrete driveway pourRick B
528 viewsFloor slabs being laid over first floor beams. The 6mm rebar seen embedded into the floor beams will be bent over the floor slabs and tied to the wire mesh laid over the floor slabs prior to pouring an additional 5cm of concrete on top of the floor slabs. This makes the finished floor ~ 10cm thick.Rick B