15 April202 viewsA little closer view of a recently plastered wall. They really do a nice job.pklongball
Storage Room Midway through a Project202 viewsThe storage room will reach maximum capacity about 1/2 way through any given project. The 1/2 way point is about the time the exterior roof is completed. After this some materials can be kept in the house.dozer
202 viewsThe frame work for the roof structure is box section 4 inch x 2 inch heavy 3.2 mm thick metal sections. There are columns at even intervals so a more extensive truss system is unnecessary (as opposed to Chok Dee #1).dozer
Marking out land201 viewsWhen we bought the land the first thing we had to do was buy some posts and have them sunk in the soil to mark the land until we have time to build a wallpaulm