happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
Lower-Level-Floor-Plan.jpg
Lower Level Floor Plan205 viewschangnoi
100_0269.JPG
204 viewsPlenty of metal work on the roof and the brick work is progressing well on the first floorThaifu T
DSC00752.JPG
204 viewsGlenn
DSC00753.JPG
204 viewsGlenn
june20_003.jpg
204 viewsmore patioGlenn
june20_002.jpg
204 viewsMaster BedroomGlenn
IM000449.jpg
pre-stressed floor slabs204 viewssomdet
P1291719.JPG
29 Jan. 2009204 viewsThe floor panels were delivered today. We have 3 different lengths to span the areas needed.pklongball
P1291725.JPG
29 Jan. 2009204 viewsThe install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongball
P2031742.JPG
3 Feb 2009204 viewsSome of the floor panels are now in place in the back area of the house.pklongball
P3171873.JPG
17 March 2009204 viewsSparky and helper installing a pipe and boxpklongball
P3261932.JPG
26 March 2009204 viewsThis shot is Sparkie's right hand man installing a section of the wireway metal chase we decided to use instead of the standard conduit and boxes. This chase will join all areas of the ceiling area together to allow cables to be pulled to any conduit stubs from the main load center as well as travel to other points.pklongball
7141 files on 596 page(s) 94

Debug Info 
Debug Output: show / hide