204 viewsPlenty of metal work on the roof and the brick work is progressing well on the first floorThaifu T
|
|
|
|
|
204 viewsMaster BedroomGlenn
|
|
pre-stressed floor slabs204 viewssomdet
|
|
29 Jan. 2009204 viewsThe floor panels were delivered today. We have 3 different lengths to span the areas needed.pklongball
|
|
29 Jan. 2009204 viewsThe install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongball
|
|
3 Feb 2009204 viewsSome of the floor panels are now in place in the back area of the house.pklongball
|
|
17 March 2009204 viewsSparky and helper installing a pipe and boxpklongball
|
|
26 March 2009204 viewsThis shot is Sparkie's right hand man installing a section of the wireway metal chase we decided to use instead of the standard conduit and boxes. This chase will join all areas of the ceiling area together to allow cables to be pulled to any conduit stubs from the main load center as well as travel to other points.pklongball
|
|