Project Exterior214 viewsThis is the front entry access to the house, which sits on about 200 sq. meters of land. The house itself is 84 square meters.dozer
|
|
|
|
|
|
Back of the house. decorative columns etc. going on 14-09-08213 viewskornoipaddy
|
|
29 Jan. 2009213 viewsJust another view of the final result of the tubing install and some debris that will be removed before the floor goes in placepklongball
|
|
June 30213 viewsThe view today of the front gate and gravel drivewaypklongball
|
|
July 10213 viewsToday we have a completed electrical panel. I am impressed with the finished look but more importantly all the circuits checked out Ok the first time they were heated up. No need to rewire anything. Sparky has completed the house portion of the job and will call PEA to come out and install the permanent meter. For now he moved the construction power/meter line over to the main house supply lines to give the house a temporary supply.pklongball
|
|
Use of Black Plastic for Splatter Control213 viewsIn preparation for color render of the perimeter wall black plastic is used extensively to protect surrounding areas of splatter.dozer
|
|
the kitchen with concrete counter tops installed212 viewskornoipaddy
|
|
19 March 2009212 viewsHere we have a wall view of the master bedroom wall and preparations to make the concrete lintel. The method for any wall lintel is to shape the AAC blocks into small pieces and glue them into the cavity to allow poring of concrete for the beam.pklongball
|
|