June 12216 viewsHere we have the old man of the crew. He is 72 and still going strong. He does most of the finish wood work for Apple our builder. Anything wood that goes in to the house such as doors, millwork etc. He saw our kitchen window trim out and complimented the cabinets folks work. Here he is doing the finish cutting to fit one of the bedroom doorspklongball
|
|
Footing frame base216 viewsThe framework base for the footings made out of 6 mm rebar.
dozer
|
|
|
|
Ceiling fan215 viewsWe have two in the living room and one in each bedroom. Cost: 620 baht.
Sorry about the green hue - the color seems to get everywhere...jazzman
|
|
External Power Point + Switch Box215 viewsThis shows holes where an external power point and switch box will be located.
dozer
|
|
Location of Electrical Breaker Panel215 viewsThis is the front right side of the house as you go in through the front door. Note the cluster of yellow PVC electrical conduit to the right of the glass blocks. This is where the electric breaker panel will be located.dozer
|
|
214 viewsthe house from the interior roadGlenn
|
|
214 viewsThis was ten carts of soil which we bought to raise the house.... I am told that it is auspicious to do that but I think it will need quite a few more carts yetpaulm
|
|
21 March 2009214 viewsIts hard to see in this photo but my interest is the aircon tubing and cables that we had installed today. Right now its kind of hanging out in nowhere until the wall gets built.pklongball
|
|
|
Day #1 - Foundation Layout214 viewsOn the first day of construction, the house footprint was located on the land from some rough markings my wife and I had placed before we returned to Phuket two days earlier. All of the land under the floor beams, as well as the holes for the column footings was hand-dug.DrDave
|
|