Most viewed
P5170879.JPG
Anther view of finshed shell with roof ongoing236 viewspattayapope
IMG_4194.JPG
Bad Cement - Indications236 viewsThis is an example of stale cement. Cement has a shelf life of about 2 months and after that it becomes non powdery and sticks together much like this large size clump indicates. Workers will often try to use this cement with out saying anything but it is low quality and can be returned if it came from the store this way. dozer
0803050305ExtRearRight.jpg
External from the Right Rear236 viewsThe bathroom wall will have glass blocks inserted at select locations to let natural light in. The lower level blocks are opaque and are in the shower stall itself. dozer
IMG_3980.JPG
Beam #3236 viewsThis shows beam #3, the top most part of the load bearing walls, after being bored. This beam had 2 lengths of 12mm rebar run horizontally throughout. Note that the electric conduit and vent pipes extend vertically through the beam.
dozer
IMG_3978.JPG
Form Work for Beam #3236 viewsThe wood form work is put in place for the concrete pour of the final (third) horizontal beam at a height of 3 m. to 3.2 m.
dozer
new_IMG_0704.jpg
235 viewstrehanse
new_IMG_0727.jpg
235 viewstrehanse
DSCF0555~0.jpg
235 viewsCookieboy
new_IMG_0737.jpg
234 viewstrehanse
P9300080.JPG
Form for the footing beams234 viewsPretty tight in there.somdet
P9300077.JPG
Water234 viewsTemporary water for the builders.somdet
IM000441.jpg
Pre-fab columns234 viewssomdet