Bad Cement - Indications236 viewsThis is an example of stale cement. Cement has a shelf life of about 2 months and after that it becomes non powdery and sticks together much like this large size clump indicates. Workers will often try to use this cement with out saying anything but it is low quality and can be returned if it came from the store this way. dozer
|
|
External from the Right Rear236 viewsThe bathroom wall will have glass blocks inserted at select locations to let natural light in. The lower level blocks are opaque and are in the shower stall itself. dozer
|
|
Beam #3236 viewsThis shows beam #3, the top most part of the load bearing walls, after being bored. This beam had 2 lengths of 12mm rebar run horizontally throughout. Note that the electric conduit and vent pipes extend vertically through the beam.
dozer
|
|
Form Work for Beam #3236 viewsThe wood form work is put in place for the concrete pour of the final (third) horizontal beam at a height of 3 m. to 3.2 m.
dozer
|
|
|
|
|
|
Form for the footing beams234 viewsPretty tight in there.somdet
|
|
Water234 viewsTemporary water for the builders.somdet
|
|
Pre-fab columns234 viewssomdet
|
|