West-facing wall.237 viewsThis will be poured cement.somdet
|
|
9 March 2009237 viewsMoving the blocks from point A to point B is backbreaking and sweaty work and always the ladies get this job.pklongball
|
|
|
Form Work for Top Beam237 viewsThe form work is in place to pour the top horizontal beam.dozer
|
|
Fascia Board237 viewsThe fascia board being applied. It fits nicely in a groove under this CPAC monier roof tiles. The bird guard is applied while this fascia board is being applied. dozer
|
|
|
|
16 March 2009236 viewsHere we have the beginning of the long exterior kitchen wall. If all goes well this will have the cooktop, oven and micro along this length.pklongball
|
|
16 March 2009236 viewsThe very early stage of the wall build. This view is from the master bedroom looking through what will be a window across the balcony to the kitchen door.pklongball
|
|
|
Floor Slab236 viewsPouring the floor slab in the kitchen.DrDave
|
|
|