happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
100_0193.JPG
238 viewsAll columns finished, they are clad in 'cling film', I presume to assist the curing process. Now working on the steel work for the beamsThaifu T
100_0377.JPG
238 viewsExterior now rendered and primer applied. Now adding bricks to the columns to increase the size. This was going to be the car port but will now be another patio (or GRAND entrance if I want to be a snob)Thaifu T
new_IMG_0705.jpg
238 viewstrehanse
Ugly_duckling.jpg
UGLY!238 viewsChinese owner must founded really cheap paint :(
This is sitting opposite of our house...!
pskog
DSC01619.JPG
thaiflys grass and sprinkler system238 viewsback elevationthaifly
100_1008.jpg
Starting the Roof Panels238 viewsAlthough you can't see it in this picture, we used standard 50x150 composite panels, but had them cut in half (75cm length) to give them a better look (more like the smaller concrete roof tiles). Since the labor contract was fixed-price, our only extra cost in doing this was that we needed twice as many fastener hooks. No extra steel was required.DrDave
IMG_3100.JPG
Blocks being Laid238 viewsHere the cinder blocks are being laid according to a 'straight' line of fishing wire which is used to keep the rows level.dozer
IMG_4190.JPG
Straight Tool used During Render238 viewsDuring the render application this tool is used to set the wall straight between depth indicators. dozer
IMG_4054.JPG
Vent Tiles238 viewsThis type of special tile is to vent the plumbing appliances up through the roof. All of the vents for this project ascend through the interior walls and will be vented jointly out of this one roof tile.dozer
IMG_0686.JPG
237 viewstrehanse
new_IMG_0715.jpg
237 viewstrehanse
P9300074.JPG
beams poured237 viewsOur floor will be about 1 meter off the ground. These are the footings for the floor.somdet
7141 files on 596 page(s) 73

Debug Info 
Debug Output: show / hide