23 March 2009240 viewsThis is the exterior living room wall about half way up and you can see the double blocks and cavity. This wall is almost ready for form wood to make the window and beampklongball
|
|
|
Bedroom Tile240 viewsTile in the rear bedroom almost finished.DrDave
|
|
June 30240 viewsAnd another look at the rear and sidepklongball
|
|
240 viewsAnother shot of the bathroom wall, showing the decorate glass block inserts, which are, in the case of the bathroom, inserted 2 blocks thick. The outside block of these group of 4 blocks, which will be located in the shower stall, are opaque (the light will come in, but shapes cannot be made out inside the shower stall).
dozer
|
|
|
|
|
|
View of front of House on the right is the open kitchen239 viewspattayapope
|
|
Ground Beam239 viewsAfter a completed pour with the metal frames distributed evenly at 2.5 meter intervals.
dozer
|
|
Ground Beam239 viewsPour in progress.
dozer
|
|