19 March 2009250 viewsHere we have a view of part of a wall and the pvc electric pipe install. This wall happens to be near the back of house that will have a window to look on the back yardpklongball
|
|
Staggered Ground Beam250 viewsA staggered ground beam design to accommodate for unevenness in the ground level.
dozer
|
|
20 cm. Thick Lintel250 viewsThis shows a finished 20 cm. lintel above the glass blocks.
dozer
|
|
249 views'Hotel California' Some of the workers lived here during the whole construction phase. Actually this helps with site security at night. Later the 'hotel' was doubled in size to accommodate more workers.Thaifu T
|
|
Column Base249 viewsThe columns (sowpoons) are set in about 30cm of concrete.DrDave
|
|
Facia Board249 viewsThe synthetic concrete composite facia board, brand Sherara, was used. It is durable, easy to install, and not overly expensive.dozer
|
|
|
|
|
Roof Structure248 viewsA clear view of the steel roof structure from the inside, after the composite panels are in place.DrDave
|
|
|