268 viewsDen looking into Entrance Hallway to Guest Bedroom, rounded door frames, sliding doorsGlenn
|
|
|
Great room from rear268 viewsMsDozer
|
|
26 Feb. 2009268 viewsIt's been a week now since they started working on the roof steel and now we finally can see a shape. This work is some of the most difficult I've seen on my place and the sun is not relenting at all. Very hot every day and the scaffold work can't be easypklongball
|
|
Partially Constructed Bathroom Wall268 viewsThis shows the bathroom wall under construction. Note the openings for bathroom windows. There is a horizontal beam (#2) below the window level and 20 cm. lintel above. dozer
|
|
267 viewsFront entranceGlenn
|
|
|
|
|
Horizontal Beam #2 being Poured266 viewsThe second horizontal support beam is being poured at a height of 2.10 meters (above the window line). These beams are tied in with the vertical columns to give horizontal strength to the design.
dozer
|
|
265 viewsDoing the shuttering for the beams. Wish my football team had as much supportThaifu T
|
|