 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSC02092.jpg
8 viewsA close up of the wood structure.dozer
DSC02100.jpg
8 viewsThe grc sheeting being laid in over the carport.dozer
DSC06003.jpg
8 viewsThe completed section over the carport. (28-Aug-04)dozer
DSC01006.jpg
8 viewsThere are 3 grades of CPAC which can be ordered. The quality is comparable to hand mix. (03-Apr-04)dozer
DSC02045.jpg
8 viewsThis is metal rolls, which are sometimes used in floor construction to save money (but not recommended). A one Baht coin in the picture is used for scale. (03-May-04)dozer
DSC01087~0.jpg
8 viewsThe pour in progress in the front bedroom.dozer
DSC01088~0.jpg
8 viewsTo prepare for the pour 2 hun metal is hand tied into a mesh pattern. (20-Apr-04)dozer
DSC02111~0.jpg
8 viewsAfter the floor is poured a level layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer
DSC02148~0.jpg
8 viewsEach tile is carefully tapped into place. (14-May-04)dozer
DSC02149~1.jpg
8 viewsHere the next tile is set in place. dozer
DSC02048~0.jpg
8 viewsThe grc sheeting is applied in sections like this. A decorative wood strip is applied as a separator on top of the grc sheeting. (03-May-04)dozer
DSC05037~1.jpg
8 viewsA completed and painted section in the rear of the house. (08-Jul-04)dozer