Bedroom no.1273 viewsThe PLEASUREDOME NO1!Cookieboy
|
|
|
Rendering273 viewsThe front and right side of the house has been rendered.DrDave
|
|
View of Pool and House from the pond273 viewspattayapope
|
|
Completed Pillars273 viewsThese pillars seem to be larger than I thought they would be. All the better they look better from outside. For my design all internal walls are flat without pillars. the external walls will show the pillarskknaj
|
|
Rebar Frame Work for Beam #3273 viewsThis is the rebar framework which will go in the top horizontal beam, located at a distance of 3 m. - 3.2 m from the floor level.
dozer
|
|
Form Work for Beam #2273 viewsThe formwork for the pour of the beam. Note the 12mm rebar laid horizontally within the beam is wire tied to each vertical piece of rebar.
dozer
|
|
Front of House273 viewsThe non consistency of the external render color coat gives a homey feel to the project.dozer
|
|
|
|
Center of the house271 viewsThis view is from the window beside the front door looking into the living room. kknaj
|
|
Oversize Cinderblock Laying Proceeds271 viewsThe block laying proceeds on top of the second horizontal beam. Note the vertical vent PVC pipes extend upward through designated holes in the blocks.