|
Most viewed |
9 viewsThe still wet surface is 'roughed' with a broom in preparation for tiling. (20-Apr-04)dozer
|
|
9 viewsPour close up. (21-Apr-04)dozer
|
|
9 viewsThe stucco being smoothed in the finishing coat.dozer
|
|
9 viewsStucco being applied to the rear of the house. (09-Apr-04)dozer
|
|
9 viewsThe stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozer
|
|
9 viewsHere is the front bedroom partially tiled. dozer
|
|
9 viewsHere a border or 'skirt' is being laid out. The wall is scored to all for maximum adhesion. The skirt should ideally be done before the wall has been painted. (14-Jun-04)dozer
|
|
9 viewsFinishing off a detail section is a doorway.dozer
|
|
9 viewsThe finished patio tile floor. (30-Aug-04).dozer
|
|
9 viewsFront valley being completed. (30-Apr-04) dozer
|
|
9 viewsWood framework. (02-May-04)dozer
|
|
9 viewsA partially enclosed section on the back part of the house.dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
568 | |
|
|
|
|
|
|
|